• Home
  • Going Lean in Health Care
  • Innovation in Organizations
  • Zero Defects
  • Eight Essential Tools for Six Sigma
  • Curious Cat Management Improvement Blog
  • Management Articles
  • Got Boondoggle? (lean)
  • Management Blog Directory
  • Panta Rei (lean)
  • Hexawise - software testing
  • October 2010
  • August 2008
  • February 2007
  • June 2006
  • May 2006
  • April 2006
  • March 2006
  • February 2006
  • January 2006
  • December 2005
  • November 2005
  • October 2005
  • September 2005
  • August 2005
  • July 2005
  • May 2005
  • Curious Cat Management Improvement Library
  • John Hunter
  • Management jobs
  • Leadership and Management Quotes
  • Public Sector Management Improvement
  •    

    New Blog Address: management.curiouscatblog.net

    Friday, September 23, 2005

    SPC: History and Understanding

    SPC: From Chaos To Wiping the Floor by Lynne Hare (who also was the 1997 Hunter Award winner)

    Shewhart based control chart limits more on the economics of change than on underlying probabilities. Ever the empiricist, Shewhart seems not to have trusted probability limits alone.


    Setting control limits at 3 standard deviations is a decision based on experience. Shewhart, Deming and others determined it was sensible to take resources to look for a special cause was most effective for results more than 3 standard deviations from the mean - it is not a mathematical conclusion but a empirical conclusion.

    It is disappointing to see some users place specification limits on control charts. Processes don't know or even care about specifications. The presence of specification limits on control charts encourages users to adjust on the basis of them instead of the calculated limits. The resulting miscued adjustments are likely to result in increased process variation, which is the opposite of the intent.


    True.

    SPC grew into everything we do. It changed the way we think, work and act, and it evolved into total quality management (TQM). But there is an ebb and flow to new technologies in our society, and TQM's star faded in the presence of reengineering, which faded with the advent of Six Sigma. All the while, the basic SPC tools have been refined and augmented, and SPC serves in muted presence to underpin the newer, expanded technologies.


    Another insightful statement.

    0 Comments:

    Post a Comment

    << Home